| LVL-2025-0142 | Meridian Battery — 5T Bay 3 Bridge | Meridian Battery | Bay 3 Bridge Crane | T2 Configurator | Complete | May 26, 2025 |
| LVL-2025-0143 | Cascade Aerospace — 10T Assembly Line Gantry | Cascade Aerospace | Assembly Line Gantry | T3 Custom Fab | Complete | Aug 24, 2025 |
| LVL-2025-0144 | High Plains Rail — 5T North Cell Jib | High Plains Rail | North Cell Jib Crane | T2 Configurator | Complete | Dec 12, 2025 |
| LVL-2026-0145 | Frontier Defense — 10T Engine Assembly Lift | Frontier Defense | Engine Assembly Lift | T1 Dropship | Installation | Jun 30, 2026 |
| LVL-2026-0146 | Silver State Steel — 20T Paint Line Bridge | Silver State Steel | Paint Line Bridge Crane | T3 Custom Fab | Installation | Jul 15, 2026 |
| LVL-2026-0147 | Sonoran EV — 2T Module Pack Gantry | Sonoran EV | Module Pack Gantry | T4 Contract / Government | Installation | Jul 28, 2026 |
| LVL-2026-0148 | Mesa Engines — 15T Structural Fab Overhead | Mesa Engines | Structural Fab Overhead | T2 Configurator | Fabrication | Aug 13, 2026 |
| LVL-2026-0149 | Buckley Air Systems — 5T Hangar 4 Bridge | Buckley Air Systems | Hangar 4 Bridge Crane | T3 Custom Fab | Fabrication | Aug 27, 2026 |
| LVL-2026-0150 | Lone Star Turbine — 15T Turbine Cell Gantry | Lone Star Turbine | Turbine Cell Gantry | T2 Configurator | Procurement | Sep 9, 2026 |
| LVL-2026-0151 | Nevada Logistics Authority — 20T Logistics Bay | Nevada Logistics Authority | Logistics Bay Crane | T1 Dropship | Procurement | Sep 25, 2026 |
| LVL-2026-0152 | Canyon Integrators — 5T Integration Lab Bridge | Canyon Integrators | Integration Lab Bridge Crane | T3 Custom Fab | Engineering | Oct 6, 2026 |
| LVL-2026-0153 | Meridian Battery — 5T Bay 3 Bridge | Meridian Battery | Bay 3 Bridge Crane | T4 Contract / Government | Awaiting Drawing Approval | Oct 20, 2026 |
| LVL-2026-0154 | Rincon GC — 15T Rail Shop Overhead | Rincon GC | Rail Shop Overhead | T2 Configurator | Awaiting Drawing Approval | Nov 3, 2026 |
| LVL-2026-0155 | Red Rock Builders — 5T Receiving Bay Overhead | Red Rock Builders | Receiving Bay Overhead | T3 Custom Fab | Opportunity / Estimating | Nov 16, 2026 |
| LVL-2026-0156 | Peak Handling — 10T South Dock Monorail | Peak Handling | South Dock Monorail | T2 Configurator | Opportunity / Estimating | Nov 30, 2026 |
| LVL-2026-0157 | Cascade Aerospace — 15T Composite Tooling Gantry | Cascade Aerospace | Composite Tooling Gantry | T1 Dropship | On Hold | Dec 12, 2026 |
| LVL-2026-0158 | Frontier Defense — 20T West Fab Bridge | Frontier Defense | West Fab Bridge Crane | T3 Custom Fab | Lost | Dec 18, 2026 |
| LVL-2026-0159 | Sonoran EV — 10T Rotor Maintenance | Sonoran EV | Rotor Maintenance Crane | T4 Contract / Government | Engineering | Dec 31, 2026 |